[Home]  [Synopsis]  [Train Layout (HO)]  [Schedule: 2002, 2003]
[For Teachers]  [What's New]  [Site Overview]
 

Alvin All-Star Railroad (AASRR)

4/30/03
Painting Layout Buildings
Facades for the Sugar Mill
Divider Historical Buildings

At left, Mr. P. (an artist Dad!) guides 2 students as work on the divider scenery continues. Above, the depot is being painted.

Below, creation of facades for the sugar mill structures begins. The tan and blue "boxes" will have these facades attached to them to create the mill buildings.



At left, two Alvin All-Star Railroaders paint the enginehouse.

Below, two other railroaders paint the lime tower for the sugar mill operation.



At left, another rotation crew works on the sugar mill facades.

Below, painting continues on the depot.



Previous  Next

[Home]  [Synopsis]  [Train Layout (HO)]  [Schedule: 2002, 2003]
[For Teachers]  [What's New]