Home of
"The PB&J"

  








© Jamie Foster, 2005-present

Progress...
June 2, 2008


Dad's got the newly-designed yard track in place.




There's now an inside siding that runs along the far side (in front of the facades) which will come back into the mainline on the right. The boxcar and level are sitting on that siding.


That switch to get the siding "back on the main" is now in place beyond the back mission wall. The mission walls did not survive the move from Nipomo well and will probably be rebuilt.




The red line shows the path of the second bridge - 22 feet! Over 13 of those feet will be a single-span arched bridge. The "switch to nowhere" on the left will go to the enginehouse.


The abutment for the end of the second bridge is now in plce.

| G-scale | 7.5" Gauge | Home | News | Links | Gift Shop | About |