Home of |
||
© Jamie Foster, 2005-present |
PB&JRR Oak Way Division Begins Construction
Track construction has finally begun after deciding where to run the Oak Way Division of the PB&JRR. The first picture is taken from Lynn and Jamie's bedroom door on the same level as the railroad. The second picture is from the main deck of the house which is a full story above the level of the railroad. This is the western terminus of the railroad. From here, it will cross two fairly lengthy bridges to the hot tub sidewalk, continue through the enclosed walkway ("tunnel") to the backyard, pass by the trampoline, and come to the eastern terminus at the base of the spiral stairs to Matt and Tracy's room. |