7.5: Huskie Kit, Track Progress 07/01/06
Trevor put in the entire day on the Huskie kit.
Check out the water slide fun yesterday.
Started playing with placement of track across the driveway. Also got the path described for the track to get to the driveway from the frontyard switch.
Jon and Matt dig out the path a little bit. The 7.5" track has to drop down to G-scale level for the crossover.
Matt starts the sod cutting process.
The undercarriage takes shape.
Got about 20 feet of ties in from the switch.
Bob helps with tie production.
Matt takes care of a spider nest in the undercarriage of the flat car.
Matt and Bob build ties.
Thread tapping.
Last ties for the day.
Serafina kept an eye on outside railroading activity from inside the quilting room.
Sam gets a little railroading in at the end of the day.