Home of |
||
© Jamie Foster, 2005-present |
July 12, 2005The first 30-foot section of track is completed, and the first car arrives!Matt loads some buckets from the first ton of gravel. Sam does a little track cleaning. Removing the center section of the tie plates that were used for spacing purposes. Left: this 30-foot section is fairly complete now. Right: 2/3s of the center plate sections have been removed. The pure joy of railroading! Trevor and Sam take the first official ride on the PB&J Railroad. The Regusci family (Tracy with soon to be Serafina, Matt, and Synergy!) on the rails with Jamie standing by. Lynn, Sam, and Jamie. The flat. | G-scale | 7.5" Gauge | Home | News | Links | Gift Shop | About | |