Home of |
||
© Jamie Foster, 2005-present |
June 4, 2005Construction of the fence continues...Matt (left) and Jon set the center post between the two gates while Trevor (barely visible in a dark blue shirt, next to the house at the left end of the trellis) mounts gate hardware. In the lower right is a gate post, all of which are filled with concrete, and the gray "drippings" inside the post are visible. Jon adjusts a gate. Matt lines up the center post. Note the heavy equipment we've brought in (yellow truck lower right). Trevor mounts gate hardware on the west side of the lot. Getting that center post in exactly the right place... Back to May 30 | On to June 9 | G-scale | 7.5" Gauge | Home | News | Links | Gift Shop | About | |